Sunday, June 10, 2007

Cement pads


After a couple of days of moving rock around to make the berms wide enough in the right places and getting the grade level (thanks to a laser level from David) the forms were ready to be put into place. The wood for the forms came from the nearby garbage transfer station about 3 miles down the road.



55- 80 pound bags of cement were mixed 2 bags at a time.


Cement mixer with totes of water hauled from a nearby "pond" of water in the road ditch.
A growing wood pile in the back ground.


Cement pad with steel wire to re-inforce.


Cement blocks filled with cement to make them more stout. They will serve to get the cabin further off the ground.